Preventive / Breakdown Maintenance/ Retrofit new CNC / Mechanical Reconditioning
Preventive Maintenance :
- » Prepare the Annual Maintenance Calendar and Maintenance check list.
- » Execute the Preventive Maintenance as per schedule.
- » Notice the abnormalities observed and report the same for corrective action
Breakdown Maintenance :
- » Attend the breakdown complaints within 8 hours of receipt of call. (Between 8.00am to 8.00pm)
Retrofit with new CNC :
- » Study the retrofit requirement of the customer and prepare the feasibility report with cost estimate.
- » On acceptance, building of new panel (if required) with wiring.
- » Design the mechanical modifications required for the retrofit activity and manufacture the same.
- » Complete the machine wiring.
- » CNC system power ON and software interface.
- » Testing the machine functions and interlock to the customer satisfaction.
Mechanical Reconditioning / rebuilding the machine. :
- » Study the reconditioning / rebuilding requirement of the customer and prepare the feasibility report with cost estimate.
- » On acceptance, list out the spares required for replacement and identify the supply source.
- » Inform the supplier for procurement.
- » Design the mechanical modifications required for reconditioning activity and manufacture the same.
- » Complete the reconditioning with high degree of scraping.
- » Testing the machine accuracy to the standards.