Preventive / Breakdown Maintenance/ Retrofit new CNC / Mechanical Reconditioning

Preventive Maintenance :

  • » Prepare the Annual Maintenance Calendar and Maintenance check list.
  • » Execute the Preventive Maintenance as per schedule.
  • » Notice the abnormalities observed and report the same for corrective action

Breakdown Maintenance :

  • » Attend the breakdown complaints within 8 hours of receipt of call. (Between 8.00am to 8.00pm)

Retrofit with new CNC :

  • » Study the retrofit requirement of the customer and prepare the feasibility report with cost estimate.
  • » On acceptance, building of new panel (if required) with wiring.
  • » Design the mechanical modifications required for the retrofit activity and manufacture the same.
  • » Complete the machine wiring.
  • » CNC system power ON and software interface.
  • » Testing the machine functions and interlock to the customer satisfaction.

Mechanical Reconditioning / rebuilding the machine. :

  • » Study the reconditioning / rebuilding requirement of the customer and prepare the feasibility report with cost estimate.
  • » On acceptance, list out the spares required for replacement and identify the supply source.
  • » Inform the supplier for procurement.
  • » Design the mechanical modifications required for reconditioning activity and manufacture the same.
  • » Complete the reconditioning with high degree of scraping.
  • » Testing the machine accuracy to the standards.